WORK REFERENCE · TYPICAL KITCHEN STAGES · ILLUSTRATIVE
Finished kitchens get photographed. The stages in the middle, when the cabinets are out and the walls are bare, decide whether those finishes last. This reference walks through six stages of a residential kitchen renovation, what gets checked at each one, and where licensed trades come in.
STAGES ON THIS SHEET
Stages are scoped at the on-site assessment as far as visible conditions allow, and set out in the written quotation. Some conditions can only be seen once the old kitchen is out.
Reference photo: a stripped-back interior with walls exposed, illustrative of stages A–B (strip-out and exposed walls). Illustrative of the type of work only, not a specific project.
A–C
OPENING UP
Benchtops, splashback, cabinets and appliances come out in an order that protects what is staying: the flooring next to the kitchen, adjoining walls and nearby joinery. Where plumbing or electrical connections need to be disconnected, appropriately authorised specialists do that work. If some cabinetry is being reused, it is removed and stored with care, not demolished. Can existing cabinets be reused?
With the cabinets gone, the wall and floor behind them can tell you a lot. Old water marks, loose or patched plaster, earlier alterations and flooring that stops short of the wall are all common. Some of this was hidden at the assessment and can only be seen now. What may be found behind old kitchen cabinets
Before anything new is fixed, Ivan checks what it will sit on: whether the wall is dry, sound and flat enough for tiles, and whether the floor is level enough for cabinets to sit true. Replacing visible finishes before these checks can cause avoidable rework. Surface preparation before new finishes · Dealing with an uneven kitchen floor
Reference photo: a wall tile pressed into a notched adhesive bed, illustrative of stage E (tiling). Illustrative only.
D–F · REBUILDING
Damaged plasterboard is patched, repaired or replaced, and holes left by old fixings are filled so the surface is ready for tiles, paint or new joinery. A tile can only be as flat as the wall behind it. Plasterboard installation and plastering
Splashback tiles are set out to suit the benchtop height, windows and power points, so cut tiles fall where they are least noticeable. Adhesive and grout are chosen to suit the substrate and a wet, greasy area. Tiling · What to check before replacing a splashback
Cabinetry is levelled and fixed, benchtops go on, and gaps are sealed where water can get in. Final plumbing and electrical connections are completed by licensed trades. Layout, cabinetry and finishes · Plumbing and electrical changes: who does what
CHECKPOINT · BEFORE YOU COMPARE
Some kitchens need little more than new finishes on sound walls. Others need plaster replaced, a floor levelled or services moved before anything new goes in. The scope for your kitchen comes from an on-site assessment, followed by a written quotation.
An inspection cannot reveal every concealed issue. Scope, permits, registration, insurance and licensed trade requirements vary from project to project.
Ivan Bodnar is an independent sole trader. He does not claim trade licences or builder registration, and licensed plumbing and electrical work is carried out by appropriately authorised specialists. Licensed trades and regulated work
RELATED READING
Before strip-out Keep the kitchen layout, or start again? · Kitchen renovations in Moorabbin
Opening up What may be found behind old cabinets · Uneven kitchen floors
Rebuilding Flooring · Interior and exterior painting · Kitchen renovation questions
Selling or renting Updating a kitchen before sale or rental
If your kitchen in Moorabbin is at the point of deciding what stays and what goes, send Ivan a few details or call 0413 142 055 to arrange an on-site assessment.